Part Number |
Item Name |
Main Ball Dia. |
Load Capacity |
Net Weight |
Main Ball Material |
Support Ball Material |
Housing Material |
2001 |
HOLE-P |
5/8" (=15.875mm) |
10 kg |
13.8 g |
PEEK |
SUS |
POM |
2002 |
HOLE-D |
5/8" (=15.875mm) |
10 kg |
13.8 g |
POM |
SUS |
POM |
* This new BTU product of materails are devided by whole POM or PEEK Ball and
POM housing.
There are twenty something of small holes inside, which are distributed in the
base and within the main ball radius.
The support balls are loaded in the holes in the base, which must be rolling
smoothly. Its difficulty is in the base that
needs to be drilling holes on the arc surface. The holes design must be smoothly
while rolling. And all above techiques
are mentioned is very highly difficult requirements.
|